PROJECT MANAGEMENT PROCESSES AND PERFORMANCE OF ROAD CONSTRUCTION PROJECTS: A CASE OF KENYA NATIONAL HIGHWAYS AUTHORITY, SOUTH RIFT REGION, KENYA

📘 Volume 13 📄 Issue 9 📅 September 2026

👤 Authors

Eric Muathe Musyoka 1 , Dr. Richard Nyaoga 2 , Dr. Jeptepkeny Chebet Bowen 3
1. Kabarak University ,
2. Egerton University,
3. Kabarak University,

📄 Abstract

Road construction projects are expected to achieve planned time, cost, quality, scope and user-satisfaction outcomes, yet delays, cost pressures and implementation challenges remain evident in Kenya. This study examined the influence of project initiation, project planning, project execution, and project monitoring and control on the performance of road construction projects implemented by the Kenya National Highways Authority (KeNHA) in the South Rift Region. The study used a mixed research design combining descriptive survey and correlational approaches. The target population was 215 respondents drawn from NCA-registered contractors, RACECA members, ACEK consulting engineers and KeNHA officials. A sample of 140 respondents was selected using proportionate stratified sampling, and 117 questionnaires were returned, giving an 83.5% response rate. Structured questionnaires and key-informant interviews were used for primary data collection. Quantitative data were analysed using descriptive statistics, Pearson correlation, simple linear regression and multiple regression; qualitative information was analysed thematically. The study found generally positive perceptions of project management practices. Project initiation, planning, execution, and monitoring and control recorded overall means of approximately 3.90, 3.90, 3.93 and 3.90, respectively. Project performance was moderately high, although timely completion was the weakest performance dimension. Pearson correlations with project performance were 0.65 for initiation, 0.71 for planning, 0.76 for execution and 0.73 for monitoring and control, all statistically significant at p < 0.01. The combined regression model was statistically significant and explained 71% of the variation in project performance (R² = 0.71; F = 78.56, p < 0.001). In the combined model, project initiation (β = 0.20), planning (β = 0.25), execution (β = 0.33), and monitoring and control (β = 0.23) were positive and statistically significant predictors (p < 0.001). The study concludes that the four processes are complementary components of project delivery and recommends stronger stakeholder engagement, realistic planning, effective contractor coordination, performance measurement, and timely corrective action.

🏷️ Keywords

Project Initiation; Project Planning; Project Execution; Monitoring and Control; Project Performance; Road Construction; KeNHA; South Rift.

📚 How to Cite:

Eric Muathe Musyoka, Dr. Richard Nyaoga, Dr. Jeptepkeny Chebet Bowen , PROJECT MANAGEMENT PROCESSES AND PERFORMANCE OF ROAD CONSTRUCTION PROJECTS: A CASE OF KENYA NATIONAL HIGHWAYS AUTHORITY, SOUTH RIFT REGION, KENYA , Volume 13 , Issue 9, September 2026, EPRA International Journal of Economics, Business and Management Studies (EBMS) , Pages: 129 - 134 ,

🔗 PDF URL

https://cdn.eprapublishing.org/article/1789966747298-16.EPRA31530.pdf

📄 PDF Preview

Click the button above to load the PDF.